Botnia | B05 - B06 - BOTNIA housing

BOTNIA S.A

Fray Bentos, Río Negro

14.785 m2

October 2005

November 2007


B05 EVAPORATION PLANT – “CAUSTICIZING” BUILDING

Volume: 13.000 CBM (concrete)
Start Date: October 2005
Finish Date: August 2007

The first stage of labor EBITAL with Botnia, was the construction of the “Causticizing” building within the evaporation plant . This involved a volume of 13.000 CBM of concrete.


B06 OFFICE BUILDING

Area: 9.000 sq.m.
Start Date: December 2006
Finish Date: November 2007

For the office building of the company, a concrete frame building was constructed and presented in rustic masonry itself (walls and plaster).


BOTNIA: HOUSES

Location: Fray Bentos, Río Negro
Area: 5.785 sq.m.
Starting Date: November 2005
Finish Date: September 2006

Another step was the implementation of a complex of 87 one-bedroom affordable housing in the neighborhood Fray Bentos 2000. T
he construction system used was prefabricated reinforced concrete panels and cover ISODEC.

Top